Mate Precision Tooling
Download the full Mate Precision Tooling Case Study in PDF format.
Challenge:
Because each tool was customer specific, product routing and tracking was very difficult and labor intensive. Lead times were running 3-5 weeks.
Solution:
Install the FACTIVITY System by FACTIVITY, Inc. of Cleveland, Ohio, which decreased lead times by 35% and doubled production within 3 years.
Result:
- Increased production by 200%
- Delivery time reduced by 35%
- Improved worker efficiency
- Improved employee morale
- Increased visibility of orders both on the floor and in customer service
- Decreased tracking time spent by foreman from several hours per day to 30 minutes
Master Brochure
Site Search
Contact Us
FACTIVITY
23400 Mercantile, #1A
Cleveland, Ohio 44122
Phone: (216) 514-5141
Tollfree: (800) 369-6377
Fax: (216) 514-5142
This email address is being protected from spambots. You need JavaScript enabled to view it.
No Images
Learn More
Download the Factivity Sales Datasheet. (pdf)
Download the Factivity Specification Sheet. (pdf)
Shop Floor Workbench
Shop Floor Workbench Overview
Documents Module
Machine Monitoring Module
Job Time Edit Module
Visual Scheduling
Capacity Planning
Finite Constraints
Impact-Analysis
Labor Accountability


