What Saint Gobain says about FACTIVITY…
Do You Know Which FACTIVITY Modules
Are Right for Your Plant?
At Saint-Gobain improving your factory floor can be a complicated, confusing task. Many executives have no idea which FACTIVITY Modules are needed to accomplish their goals...improving productivity, tracking jobs and employee performance, scheduling jobs, etc.
Factivity has several modules...that accomplish different tasks. Below you will find a brief description of each module. If you want more info, please click on Learn More.
Shop Floor Module
Factivity delivers information to the factory floor in a paperless solution...real-time job documents to operators and supervisors.
As information is collected in FACTIVITY, it is analyzed in real-time, providing appropriate checks, alerts and messages so corrective action can take place.
As a by-product of better floor visibility and control, this floor level system allows effective error proofing of data updating files.
Planning & Scheduling
Provides your production scheduler with powerful graphical interfaces which can be used to visually optimize real-time work loads across work centers and machines.
The interfaces can be optimized with custom filters and advanced planning functions to programatically arrange your work requirements based on your customer criteria and deliver it to the floor.
Machine Monitoring Module
Real-time monitoring of floor assets provides the bridge for updating machine status, recording production and enabling visibility to important resources without operator data entry.
Detail events are captured and summarized into such well known metrics as, OEE, with identification to specific assets.
Master Brochure
Site Search
Contact Us
FACTIVITY
23400 Mercantile, #1A
Cleveland, Ohio 44122
Phone: (216) 514-5141
Tollfree: (800) 369-6377
Fax: (216) 514-5142
This email address is being protected from spambots. You need JavaScript enabled to view it.
Shop Floor Workbench
Shop Floor Workbench Overview
Documents Module
Machine Monitoring Module
Job Time Edit Module
Visual Scheduling
Capacity Planning
Finite Constraints
Impact-Analysis
Labor Accountability

