Install, timed with contract from Caterpillar, gives management complete visibility of operations
CLEVELAND (October 2, 2009) ā Factivity fit Swanson Industries with its shop floor technology in August 2008āreplacing pen-to-paper with a PC based manufacturing execution system (MES). The transition proved easy company-wide; operators and top tier management are now equipped with real time business information to make informed decisions while jobs are on the line.
Installation, while coupled with QAD, followed Swanson landing a contract from a global supplier of heavy construction machinery to manufacture hydraulic cylinders.
āIn order to exceed expectations, we knew we needed a new software system, and one that gave us more control of parts as they moved through the factory,ā says Howard Nelson, CFO. Swanson Industries, Inc., based in Morgantown, West Virginia, is an industry leader in the manufacture and remanufacture of parts for the fluid power industry, as well as mining and construction.
While QAD replaced the legacy software system ā aligning all business processes, including shop floor time reporting and production ā it did not provide the necessary visibility of the lineāto schedule and track orders, and monitor machines and time and attendance. Cleveland based Factivity was contracted to provide this (secondary, but) necessary componentāand integrate it with QAD.
āHaving complete visibility of the floor activities is important to us,ā says Nelson.
The install of Factivity, however, did not go without reservation from the line. āMany of our operators were more comfortable with putting pen to paper, than using a PC,ā says John Godwin, Operations Manager, Swanson Plating Company, a subsidiary of Swanson Industries.
Despite their fear, Factivity successfully had Swansonās over 150 machine operators up and running comfortably on the system on day one. āWe held initial training sessions and retrained anyone who felt they needed it,ā says John Leibert, president, Factivity. āItās a touch screen system with color coded icons and large graphics, so itās designed for ease of use, at any skill level.ā
Shortly after the installation, Godwin and his operations team were wowed by the system. āItās like we went from the dark ages to world class manufacturing,ā he says.
For the first time, data was being collected real time at multiple points of production, and management was able to view it now, not two days from now. Also, it was possible for operators to view prints on the data collection PCs instead of using print books that have potential of outdated information. More importantly, Factivity provided a solution to meet a requirement from Swansonās largest customer to provide lot tracking.
Labor reporting, for example, had previously been recorded on paper by the operator, and then passed on to a data entry specialist who would type the information into the systemāoften times, days later. āThis wasnāt an entirely error proof system,ā says Godwin. There was potential for error when the information was written down and when it was keyed.
Today, all is monitored machine side using Factivityās software on touch screen PCs. āWe know exactly where an operator is on a job, and we know exactly where the parts areā, says Godwin.
Because of job sequencing, operators are able to make informed decisions about what happens next on the line too. A job designated as āhotā shows in red on the Factivity screens. āThey know whatās priority and whatās not,ā says Godwin.
The Factivity software was modified to include a reject button. āWe needed to be able to back a part up on the line if it required additional labor,ā Godwin says. Before the Factivity software modification, when a part went down the line, an operator could not go back and make a change either to the work order or part. It required supervisor intervention. Today, both are possible and the change is communicated to the appropriate departments.
Another benefit of the technology is accountability. Because each operator is assigned a pass code, management is able to monitor their performance throughout the day. āWeāre able to identify problem areas and address them quickly.ā āThe continuing education of our line operators is important and key to our ongoing success, says Godwin.
It is a form of quality control too says Godwin. āIf a rod is machined improperly and ultimately shipped to a customer and rejected, we can go back and see where and on whose watch this happened,ā says Godwin, āand prevent it from happening again.ā
A year later, one of the biggest benefits of Factivity is a 28.6% reduction in Work In Process inventory on Swansonās shop floor. In addition, Factivity contributed to an increase of on time shipments and a substantial reduction of past due orders.
One further enhancement is in the works. Swanson and Factivity are working together to pass time and attendance data from the Factivity stations to the Swanson payroll system. This will eliminate time cards and data entry.